• <blockquote id="awfwd"><sup id="awfwd"></sup></blockquote>

  • 色欧美片视频在线观看,福利一区二区三区微拍视频,野花社区视频在线观看,人人爽夜夜爽天天喷水,亚洲激情在线看,2020国自产拍精品免费观看,欧美日韩精品在线,国产精品国产三级国产专区5o
    從事濟南彩鋼板房,彩鋼瓦,復合板,巖棉板,C型鋼,濟南鋼結構的廠家
    服務電話:13573174182
    熱門搜索:濟南方管,濟南彩鋼瓦,濟南巖棉板,濟南型鋼,濟南樓承板,濟南泡沫復合板
    公司動態 所在位置- 首頁-新聞中心-公司動態

    濟南巖棉板:TPO防水卷材在巖棉板上的施工

    發布時間:2025-08-18 來源:http://m.yuancloud.cn/

    base64_image  1、TPO卷材的鋪設

      1. Laying of TPO rolls

      鋪設卷材,要平整、順直。

      Laying the roll material should be smooth and straight.

      2、TPO卷材的固定

      2. Fixing of TPO coil material

      大面卷材按平行于屋脊的方向鋪設,長邊用機械固定釘及墊片有必要固定在工廠預制好的標記線上,墊片邊距卷材邊沿最小13mm。

      The large surface roll material is laid in a direction parallel to the ridge, and the long side is fixed with mechanical nails and gaskets. It is necessary to fix it on the pre made marking line in the factory, and the gasket edge should be at least 13mm away from the edge of the roll material.

      屋面的固定螺釘按照金屬屋面板的波峰間隔進行定位,有必要保證固定間隔為0.152m,保證釘子位于波峰的中心方位,運用套筒及緊固件固定TPO 防水卷材和保溫板。

      The fixing screws on the roof are positioned according to the peak interval of the metal roof panel. It is necessary to ensure that the fixing interval is 0.152m and that the nails are located in the center of the peak. Use sleeves and fasteners to fix the TPO waterproofing membrane and insulation board.

      3、 TPO卷材的焊接

      3. Welding of TPO coil material

      隔汽層、巖棉層、TPO卷材鋪設好往后,保證同步進行,依次循環操作,用LEISTER VARIMAT- V 自動焊接機焊接每一個搭接邊,部分節點部位選用LEISTER 手持焊接機焊接。

      After the installation of the vapor barrier layer, rock wool layer, and TPO roll material, ensure synchronous operation and repeat the operation in sequence. Use LEISTER VARIMAT-V automatic welding machine to weld each overlapping edge, and use LEISTER handheld welding machine to weld some node parts.

      自動焊機焊縫焊接:焊機壓力為500-550N 左右,溫度為500-550℃,焊接速度為1.5-2m/min, 詳細情況視現場條件(溫度、濕度)而定。每天最少進行一次試焊,選用拋棄的裁切資料進行試焊剝離,只有到達層間剝離,而  非焊縫剝離的參數設置,方可進行焊接。如一天內溫差較大,需根據情況,及時根據試焊情況,調整焊接參數。

      Automatic welding machine for weld seam welding: The welding machine pressure is around 500-550N, the temperature is 500-550 ℃, and the welding speed is 1.5-2m/min. The detailed situation depends on the site conditions (temperature, humidity). At least one trial welding should be conducted every day, using discarded cutting materials for trial welding and peeling. Only when the parameters for interlayer peeling are reached, rather than weld peeling, can welding be carried out. If there is a large temperature difference within a day, the welding parameters should be adjusted in a timely manner according to the test welding situation.

      手藝焊接:焊槍溫度控制在250-450℃之間,焊接速度為0.2-0.5m/min,焊接時用手動壓輥壓實,隨焊隨壓。短邊選用不固定辦法直接焊接,卷材的搭接寬度為80mm

      Craft welding: The temperature of the welding gun is controlled between 250-450 ℃, and the welding speed is 0.2-0.5m/min. During welding, manual pressure rollers are used to compact and press as welding progresses. The short side is welded directly using an unsecured method, and the overlap width of the coil is 80mm

      天窗及女兒墻節點施工,大面卷材天窗邊沿處斷開。假如天窗邊沿的鋼板正好是波峰方位,則可直接進行下一步施工;否則邊沿處的鋼板不是波峰方位,需要在鋼板邊沿附加一個L型折板,折板材質類同底層鋼板即可。沿天窗一周,將大面卷材用固定件固定。固定間隔為30cm。按照天窗高度和搭接15cm下料,掩蓋大面卷材固定件,下端焊接。陽角處用陽角泛水補丁掩蓋,要求上部泛水高度超出20mm。上部用壓條和釘子固定,此處須配套運用密封膏。壓條的固定件間隔為25cm,密封膏運用在卷材邊沿和底層的連接處。

      The construction of the skylight and parapet nodes involves the disconnection of the edge of the large surface roll skylight. If the steel plate at the edge of the skylight is in the direction of the wave peak, the next step of construction can be carried out directly; Otherwise, the steel plate at the edge is not in the direction of the wave peak, and an L-shaped folded plate needs to be attached to the edge of the steel plate. The folded plate material should be similar to the bottom steel plate. Fix the large roll material with fasteners along the skylight. The fixed interval is 30cm. Cut the material according to the height of the skylight and overlap 15cm, cover the large surface coil fixing parts, and weld the lower end. Cover the sunny corner with a waterproof patch, and ensure that the upper waterproof height exceeds 20mm. Fix the upper part with pressure strips and nails, and use sealant to match this area. The spacing between the fixing parts of the pressure strip is 25cm, and the sealing paste is applied at the connection between the edge of the roll and the bottom layer.

      本文由  濟南巖棉板 友情奉獻.更多有關的知識請點擊  http://m.yuancloud.cn/   真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

      This article is a friendly contribution from Jinan rock wool board For more related knowledge, please click http://m.yuancloud.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

    主站蜘蛛池模板: 亚洲国产一区二区三区| 无码免费毛片一区二区| 国产精品中文字幕日韩| 欧美成 人 在线播放视频| 亚洲激情国产一区二区三区| 少妇爱做高清免费视频| 国产精品卡1卡2卡三卡四| 国产精品麻豆成人AV电影艾秋 | 男女作爱免费网站| 亚洲国产精品久久综合网| 国产最爽的乱婬视频国语对白 | 免费国产一级 片内射日本欧州| 国产2021中文天码字幕| 9AV好看视频在线观看欧美| 免费国产一级a片v| 偷窥亚洲欧美精品自拍| 久久99国产精品尤物| 国产情侣一区二区三区| 国产一区二区波多野结衣| 华蓥市| 国产精品免费无码专区| 日韩精品人妻在线| 日韩欧美亚洲一中文字暮| 好深好爽办公室做视频| 国产精品视频一区无码| 欧美爽爽va在线观看| 乱色欧美激惰| 亚洲人成图片小说网站| 华人黄网站大全| 无人区一线二线三线乱码| 国产亚洲精品久久久久久| 国产免费最爽的乱婬视频a | 久久成年女性毛片免费播放| zyz玖玖资源站免费中文| 日本黄一区二区| 国产一区二区午夜福利久久| 冕宁县| 国产精品网址在线观看你懂的| 一级毛片国产a级毛片| 国产内射老熟女AAAA| 精品久久香蕉国产线看观看亚洲|